Project sector: Operation and maintenance of irrigation & drainage networks

Project status: Ongoing 

Project Location: Ilam Province  

Project objective: Operation of network installations and sprinklers at the end of the Fakkeh and Eine khosh Channel, main pipelines of pressurized irrigation networks (degree 1& 2), drainage networks of Fakkeh and Eine khosh Channel, and main channels of these two plains, also all the installed valves on these pipes for transferring water to the delivery points (at the first of degree 3 of pipelines)

Project starting date: December 2019

Project completion date: December 2020

Project duration: One year

8F5342A0 6723 4B0F B23D 014CD68918DC

ilam